London Skyline

Avebury Boulevard, Milton Keynes

Developer: Business Environment Group Ltd
Main Contractor: 360 Engineering Ltd
Project Value: £1.2m

Full replacement of existing boilers & chillers for this 6,000metre squared building in Milton Keynes. Working directly for the landlord, we had full responsibility for the design of the replacement with a brief from the client to guarantee performance for their tenants & provide them with energy usage forecasts showing savings over the existing systems.

We designed a solution using Daikin VRV Heat Recovery Systems to provide independent heating & cooling with full local & centralised control with an energy save expectation of 60%. The design consisted of Ceiling Concealed Fan Coils ducted to Linear Slot Diffusers around the perimeters.

The project ran for 18 months with all works being performed out of hours and as the old services were decommissioned & removed, the new systems were brought on-line without any loss of service to the tenants.

Back View PDF